Page 1 of 5 Construction Steps
- Topsoil is removal and site levelled.
- Foundation and drainange trenches dug
- Drainage system laid in ground and backfilled with crushed linestone
- Geo-tex membrane installed to prevent silting of drainage system
- 100mm of course crushed limestone installed and levelled and compacted
- Post and rail fencing installed with the kick boarding which retains the riding surface
- Geo-tex membrane installed and then stone and silica sand
- Rubber chip (optional)
|
|